Maintenance
Proton Scheduled System Update
Resolved May 31 at 03:05am EDT
Starting from May 25th until June 7th, Proton will be conducting scheduled system updates to strengthen their infrastructure. Some users of their VPN service may experience downtime lasting a few minutes.
Expected High Intranet Load
Resolved May 22 at 08:14am EDT
A high load on the intranet is expected and tunnels may be affected between the dates listed.
The reason for this is an anticipated increase in users during device redistribution and diagnostics. Thus, expect maintenance to be at large during this time, and downtime can be expected.
Tunnel Maintenence
Resolved May 21 at 10:46am EDT
Scheduled maintenance is currently in progress.
No further information is provided
2 previous updates